What to Know Before Pouring a Concrete Slab
Once the concrete agitator backs up to site, decisions have to move fast. Getting drawings, underground services, formwork levels, steel cover and weather contingencies sorted beforehand is what separates a calm pour from an expensive scramble.
- Confirm whether your slab requires structural engineering design and a building permit before excavation starts.
- Check underground utilities via Before You Dig Australia (BYDA) and complete all under-slab plumbing/conduit rough-ins prior to membrane taping.